Thursday, 20 June 2013

5 Minute Film 'Circle': Pre- Production- Risk Assessment

RISK ASSESSMENT:


1. RISK: Filming In The Dark
LEVEL OF RISK: High
PREVENT: Make sure that we don't bump into anything.
RESPONSIBLE: All Of Us.


2. RISK: Liquid Near The Equipment
LEVEL OF RISKHigh
PREVENT: Make sure there are no drinks near any of the equipment being used.
RESPONSIBLE: All Of Us.


3. RISK: Camera Running Out Of Memory Or No SD Card

LEVEL OF RISK: Medium

PREVENT: Make sure we have checked that there is a SD card before using it.
RESPONSIBLE: All Of Us.

4. RISK: Scenes That Involve Stunts
LEVEL OF RISK
: High
PREVENT: Make sure we have run through the scenes before we actually start filming it. Make sure that the person doing the stunt is in a safe environment.
RESPONSIBLE: All Of Us.


5. RISK: Loosing Equipment
LEVEL OF RISK
: High
PREVENT: Make sure that all the equipment are in a safe place. 
RESPONSIBLE: All Of Us.


6. RISK: The Environment
LEVEL OF RISK
: Low
PREVENT: Make sure that we are filming in a safe envrionment and that we don't get distracted when filming.
RESPONSIBLE: All Of Us.

No comments:

Post a Comment